Load from new data center customers could reach 80 GW by 2030. This could be a big opportunity and a massive and complex problem, too. Microgrids and on-site power can help.
Plug Power plans to build up six green hydrogen-electrolyzer plants with the LPO loan funds. Early in 2024, Plug commenced operations on its electrolytic liquid hydrogen production...
The rising costs could prove even higher for the Chinese-based materials such as direct current (DC) blocks, the report forecasts. The Clean Energy Associates (CEA) study used...
The batteries will be spread out over six plants, helping enhance grid stability and energy independence within Ukraine, which has been at war since Russia invaded more than two...